The Importance of Doing the Concrete RH Test Correctly
The F2170 procedure for RH testing of concrete floor slabs states that we should - Insert the hole liner to the bottom of the hole. Cap or seal the open end of the hole liner and any open gaps at the top of the liner per manufacturer’s instructions. Allow 24 hours to achieve moisture equilibrium within the hole before making relative humidity measurements.